Tilburg – Blauwe Ader (NL)

Project
Microtunneling and pumping station (Project “Blauwe Ader” – Hasseltstraat en Midden-Brabantweg)

Client
City of Tilburg

Crossing
Roads, vegetation, “Wilhelmina”-Canal

Diameter / Length
ID 1600 mm / 957 m
ID 1800 mm / 2.360 m (900 m – 670 m – 790 m)

Execution
2016 – 2017

.

OTHER PROJECTS

Brugge

Brugge (B)

High voltage cable tunnels (ELIA) under the “Boudewijnkanaal”