Renovatie Moerriool Diestersteenweg
Refurbishment of our AVND2400 TBM Hasselt The crew in our own work shop refurbished the AVND2400 TBM and equipment completely, both electrically and mechanically.They also adapted the cutting wheel especially to meet the soil conditions for the next job.
Project Quirnbach, Germany DN1400: 200M long Pipeline in the Quirnbach dam is installed using microtunneling. The challenge for this project is not the length but the slope. The level difference of 37m over 200m puts the technology to the test. The severe slope in this project brings along some practical difficulties. Walking trough the tunnel …
Project Neustadt Donaudüker DN2000: small execution windows are no excuse! K-Boringen completed the drive under the River Donau. Quality, Safety and Environment was priority during the execution. Project manager Stijn Philips commented: “The great team made this project possible. The constructive attitude of all the people eases the pain of a technical challenging project! We …
Toevoerleiding voor een Zwitserse waterkrachtcentrale
High voltage cable tunnels (ELIA) under the “Boudewijnkanaal”
Storm water tunnel for the city center
Intake-tunnel for a desalination plant
Vacature ELEKTROTECHNIEKER TUNNELLINGPROJECTEN met uitgesproken hands-oninstelling en technisch INzicht Met de sleufloze aanleg van leidingen en tunnels heeft K-Boringen een grensverleggende internationale reputatie opgebouwd. Met een uitgebreid machinepark en de inzet van meer dan 50 deskundige medewerkers garandeert K-Boringen een uiterst vlotte en flexibele service. Om de verdere groei te verzekeren, zijn we momenteel op …
BASF-Utility tunnel under the river Rhine