kallo (B)

Project
Outlet construction fort the dewatering of the logistics site “Loghidden City (Katoennatie)” towards the river Scheldt

Client
Katoennatie NV

Crossing
several pipe lines, a road and dike of the Scheldt

Diameter / Length
ID 1600 mm / 2 x parallel 190 m

Execution
2012

Remarks
Turnkey project, as building team project.

.

OTHER PROJECTS

Brugge

Brugge (B)

High voltage cable tunnels (ELIA) under the “Boudewijnkanaal”