Miami (USA)

Project
Design-Build Services for Gravity Sewer Interceptors for the Master Pump Station No.3

Client
Miami Dade County Water and Sewer Department

Diameter / Lengthe
ID 1200 / 4 drives, in total 1341 m (between 180 m and 460 m)

Execution
2015

Remarks
Design-build project in Joint Venture with Jacobs Engineering and Ric-Man Construction. Tunnelling specialists, microtunnel equipment and polymer concrete jacking pipes were shipped from Europe.

.

OTHER PROJECTS

Brugge

Brugge (B)

High voltage cable tunnels (ELIA) under the “Boudewijnkanaal”